The treatment itself is usually the shortest part. Contact time and airing take longer.
When a client asks how long it will take, they usually have one number in mind. In practice there are four separate stages, and only one of them is “work” that can be sped up.
So the answer to “how long” is always two numbers: how long we are on site, and how long before you can go back in. They are not the same.
| Method | Treatment | Contact time and airing |
|---|---|---|
| Surface treatment | Depends on the number of surfaces | Short contact time |
| Fogging | Relatively quick | Contact time + thorough airing |
| Ozone treatment | Depends on the volume | Room kept closed + thorough airing |
| Drying after flooding | — | Days to weeks |
The most important practical conclusion: plan for the airing time, not just the treatment time. That is what determines when you can use the room again. We give exact times for each method and room before the work — they depend on volume and intensity, so a universal figure here would be misleading.
The age of the building affects the timing more than you would expect. In a pre-war building with timber floor structures and deep voids, inspection and gaining access take noticeably longer than in a Soviet-era panel block, where the structure is simple and predictable. A new build, on the other hand, often adds the question of mechanical ventilation: it has to be stopped or switched over for a while, and that must be agreed with the property manager in advance, not on the day.
We do not promise to arrive at a particular minute. We agree a time window and tell you if it changes.
Not the treatment, but the things around it:
If anyone promises to dry out a flooded structure in a day, that is not realistic. Readings show when a structure is dry — not the calendar and not a promise. A concrete floor slab gives up water slowly, and the thin levelling layer above it can feel dry to the touch while moisture remains underneath.
A concrete example. A 55 m² two-room flat in Imanta, ozone treatment against a smell left by previous tenants. The client prepared the room in the morning, we arrived around midday, the treatment and contact time ran while he was at work, and a neighbour with a key opened the windows for airing. By the evening the flat was usable. No day was lost.
What to do once the treatment is over is covered separately: what to do after disinfection.
Part of the time is fixed — contact time cannot be shortened and drying cannot be rushed. But a substantial part depends on what happens before we arrive, and that is exactly what you can influence.
Another factor that changes the timing more than anything else is whether the inspection happens separately or in the same visit as the treatment. In straightforward flats the two can often be combined. But where damp inside the structure, extensive damage or several sources are suspected, the inspection happens separately — otherwise the scope of treatment gets planned on site and by eye, and that ends in a revised quote.
The season matters too, if indirectly. Demand is highest in autumn and the first months of the heating season, so the wait for a visit is longer than in summer. If the work is not urgent, it can usually be scheduled more conveniently and flexibly in summer.
In most domestic cases, yes. If drying or removal of materials is needed, the work happens in several stages.
We give the exact time before the work, once we know the method and the volume of the room — so you can plan your day.
Yes, if you can arrange access. Many clients do exactly that — we carry out the treatment and you return after the stated time.
Describe the situation — we will tell you whether treatment is needed at all, and which one.
Fill in the form — we will call you on the number you provide, ask a few clarifying questions and propose a solution.
Thank you! We will contact you on the phone number you provided shortly.